The preferred method of pricing is to link the offer price to the London Metal Exchange rate for copper, (http://www.lme.co.uk/copper.asp). Price offers should be for the material to be supplied ex-works. If accepted your price would be fixed for the period of 12 months over which the supplier is offering material.
The following photos detail the copper material available:










No comments:
Post a Comment